Pengembangan Jaringan Distribusi SPAM Gedebage

Overview

Development and Management of Gedebage SPAM which includes Distribution Network to Reticulation pipeline with investment in technology for effective and efficient SPAM operation and maintenance with B to B cooperation mechanism.

The Gedebage SPAM Block consists of 5 sub-districts and 11 sub-districts with a total population of 208,271 people or 42,196 families. With existing customers reaching 14,328 SL.

Accessibility

  • High accessibility in the Gedebage area makes it easy to reach other areas in the City and Bandung Regency
  • Has the Buahbatu Interchange and has a road that connects to the main streets in Bandung

Supporting Infrastructure

  • Gedebage Area is a Strategic Area of ​​Bandung City which is planned as a Technopolis City
  • Infrastructure development such as LRT, Monorail
  • Inner city highway construction
  • Construction of the Gedebage interchange connecting the Purbaleunyi and Gedebage toll roads

Project Value

Rp 177.43 Billion

General Condition

Project Area : 16,811 Km2

Cikalong WTP water source : 700 L/sec

Physical

  • Established in 1978 from an express fee
  • Building is in poor condition
  • In 1995 there was a fire and the traders were rehabilitated on their own
  • Planned to be revitalized from 2018 but not implemented

Scope of Work

  • DMA Development
  • Development of distribution network for reticulation
  • Scada System
  • NRW Control

Build Time

3 months

Revenue Plan

0.9 Billion/Year

System Admin ico-vefified-1

Member Since Aug 2020

Value: Rp177.430.000.000

Extra prices:

({{type.price_type}})
{{type.price_html}}
({{type.price_type}})
{{ type.price }}%
{{ formatMoney(type.price) }}
  • {{total_price_html}}
  • {{pay_now_price_html}}
from
Rp177.430.000.000